BIM modeling of photovoltaic plants: topography, civil works, main electrical equipment, technical buildings, MEP and interference coordination with detailed reporting.
Topographic surface modeling (base of the work).
Modeling of:
- Internal roads and access
- Main drainage
- Main electrical equipment: Transformation Centers (TC)
- Main trenches (DC, AC and MT)
- Main electrical layout (cable trays, without individual cable detail)
- Representative volumes of cable packages, with equivalent dimensions, to validate trench occupancy and transitions into the TC
Technical buildings modeling (including technical floors):
- Transformation Center (TC)
- Switchgear room
- Communications room
- General services buildings
MEP modeling of installations for the photovoltaic plant and general buildings.
Interference coordination between disciplines:
- Interference analysis between structures, topography, civil works, trenches and TC
- Interference report with identification, location and observations